Deliverables
  OCERA Home  /  Download  /  Documents  /  Deliverables
  Deliverables
    MS 1: First review 
    MS 2: Second review 
    MS 3: Milestone MS 3 
    MS 4: Third review 
    MS 5: Final Review 

  Documentation
    RTOS analysis  
    Architecture  
    Market analysis  
    Resource management  
    Scheduling  
    Fault-tolerance  
    Communication  
    Validation  
    Training and support  

  Technical reports
    RTOS analysis  
    Architecture  
    Scheduling  

  Dissemination
    Posters 
    Leaflets 
    Videos 

Deliverables

   Deliverables of the Milestone 1. First review. Prague. November 12, 2002.
Workpackages: RTOS state of the art analysis (WP1), Architecture specification (WP2), Market analysis (WP3), Dissemination and implementation (WWW) (WP11) and Assessment and evaluation (WP12).
Deliverables: RTOS analysis (D1.1), Architecture and Components integration (revised) (D2.1), Feedback from RTOS users (revised) (D3.1), Functionality not available in open RTOS (D3.2), New approaches from academia (D3.3), Project presentation and initial web site (D11.1), Web site specification (D11.2), Web site implementation (D11.3), Dissemination and Use Plan (D11.5) and Assessment and evaluation plan (revised) (D12.1).
Month: 6 [more ...]

   Deliverables for the Milestone 2. Second review.
Workpackages: Development of resource management components (WP4), Development of real-time scheduling components (WP5), Development of fault-tolerance components (WP6), Development of communication components (WP7), Integration phase (WP8), Validation on platform (WP9) and Training and technical support (WP10).
Deliverables: Design of resource management components (D4.1), Resource management components V1 (D4.2_rep), Design of scheduling components (D5.1), Scheduling components V1 (D5.2_rep), Design of fault tolerance components (D6.1), Fault tolerance components V1 (D6.2_rep), Design of communication components (D7.1), Communication components V1 (D7.2_rep), Integration plan (D8.1), Multimedia application requirements and platform analysis (D9mm.1), Process control application requirements and platform analysis (D9pc.1), Robotic application requirements and platform analysis (D9rb.1), Bug tracking system specification (D10.1) and CVS server specification (D10.2).
Month: 12 [more ...]

   Deliverables for the Milestone 3.
Workpackages: Market analysis (WP3), Development of resource management components (WP4), Development of real-time scheduling components (WP5), Development of fault-tolerance components (WP6), Development of communication components (WP7), Integration phase (WP8), Validation on platform (WP9), Dissemination and implementation (WWW) (WP11), Training and technical support (WP10) and Assessment and evaluation (WP12).
Deliverables: Set of recommendations (D3.4), Definition of new RM functionalities (D4.3), Definition of new scheduling functionalities (D5.3), Design of new fault-tolerance facilities (D6.3), Design of new communication drivers (D7.3), Integration of OCERA System V1 (D8.1_rep), Multimedia Application Component Specification (D9mm.2), Multimedia Application V1 (D9mm.3_rep), Process Control Application Component Specification (D9pc.2), Process Control Application V1 (D9pc.3_rep), Robotic Application Component Specification (D9rb.2), Robotic Application V1 (D9rb.3_rep), Dissemination activities I period (D11.6), User's Guide V1 (D10.3), Programmer's Guide V1 (D10.4) and Prototype evaluation V1 (D12.2).
Month: 18 [more ...]

   Deliverables for the Milestone 4. Third review.
Workpackages: Development of resource management components (WP4), Development of real-time scheduling components (WP5), Development of fault-tolerance components (WP6), Development of communication components (WP7), Training and technical support (WP10) and Dissemination and implementation (WWW) (WP11).
Deliverables: Resource Management Components V2 (D4.4), Scheduling Components V2 (D5.4), Fault Tolerance Components V2 (D6.4), Communication Components V2 (D7.4), Training Documentation. Case studies for RTLinux (D10.5), Exploitation plan draft (D11.8) and Dissemination activities (whitepaper).
Month: 24 [more ...]

   Deliverables for the Final Review.
Workpackages: Integration phase (WP8), Validation on platform (WP9), Training and technical support (WP10), Dissemination and implementation (WWW) (WP11) and Assessment and evaluation (WP12).
Deliverables: Integration V2 and configuration tool (D8.2_rep), Multimedia Application V2 (D9mm.4_rep), Process Control Application V2 (D9pc.4_rep), Robotic Application V2 (D9rb.4_rep), User's Guide V2 (D10.7), Programmer's Guide V2 (D10.8), Web site report and statistics (D11.4), Dissemination activities II period (D11.7), Exploitation plan draft V2 (D11.8), Technology Implementation Plan (D11.9) and Prototype evaluation V2 (D12.3).
Month: 30 [more ...]


© OCERA Project. webmaster@ocera.org
Maintained by: Sergio Sáez   Last update: Tue Feb 14 13:03:57 2006